Vancouver International Airport
/ Spectrum
Civic / Transportation Infrastructure
Richmond BC
Project Overview
Spectrum Painting has been engaged across multiple phases of expansion and development at Vancouver International Airport, beginning with the International Terminal Building in 1996 and continuing through the East and West Chevron additions and the Pier C Expansion. Across all phases, Spectrum’s scope has included vinyl wallcovering installation, concrete sandblasting, water repellant coatings, and the painting of interior steel components throughout the various terminal buildings.
Scope
- Vinyl wallcovering installation
- Concrete sandblasting
- Water repellant coating application
- Interior steel component painting
Key Areas Included
- International Terminal Building (ITB) — 1996
- East Chevron addition
- West Chevron addition
- Pier C Expansion
Start a Conversation
For inquiries related to commercial/industrial , building restoration or Fireproofing projects across Metro Vancouver, connect with Spectrum Painting to discuss scope, timelines, and next steps.
© 2026 Spectrum Painting Ltd. -